Anicia Brown AS Media
Saturday, 28 April 2012
Thursday, 12 April 2012
Thursday, 5 April 2012
Evaluation Filming
Today myself and the rest of my group members will be filming the evaluation part of our coursework. This evaluation is filmed to show evidence to the examiner about what skills and different things we learnt over the process of making our media product (opening sequence). For example some of the things that we would be discussing in our evaluation is, what we learnt from filming our preliminary task to the final full product at the end.
Wednesday, 14 March 2012
Pictures to show evidence of Filming
These pictures were taken to show our evidence of our fiming process for the final draft of our media product (the opening sequence)
Sunday, 11 March 2012
Media Production Filming Short term plans- For Final Draft
Media Studies Short Term Media Plans
DATE & TIME | LOCATION | RISK ASSESSMENT (Health & Safety) | Costume/Props Needed | EQUIPMENT Needed |
Tuesday 13th March 2012 3:30pm as it starts to get dark around 5-5:15pm | -Wormwood scrubs (next to Linford Christie Stadium) -by the 220 bus from Harlesden (park Parade bus stop) and the same bus back -public place open 24/7 -We are able to film without permission as it is an open and public space | Actors: we have permission to film the actor. Health: yes both actors are fit and healthy to film on this day If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc. Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road Safety: we have to be safe with the tripod and the camera as the ground is not all on one level | Costume 1st actor: black trousers, black bin bag, black shoes, red and black coat | 1 Video camcorder (Sony) 1 Tripod 1 camera charger |
DATE & TIME | LOCATION | RISK ASSESSMENT (HEALTH & SAFETY) | Costume/ Props Needed | EQUIPMENT Needed |
Wednesday 14th March 2012 | Wormwood scrubs (next to Linford Christie Stadium) -by the 220 bus from Harlesden (park Parade bus stop) and the same bus back -public place open 24/7 -We are able to film without permission as it is an open and public space | Actors: we have permission to film the actor. Health: yes both actors are fit and healthy to film on this day If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc. Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road Safety: we have to be safe with the tripod and the camera as the ground is not all on one level | Costume 1st actor: black trousers, black bin bag, black shoes, red and black coat | 1 Video camcorder (Sony) 1 Tripod 1 camera charger |
Saturday, 10 March 2012
Subscribe to:
Posts (Atom)