Thursday, 5 April 2012

Evaluation Filming

Today myself and the rest of my group members will be filming the evaluation part of our coursework. This evaluation is filmed to show evidence to the examiner about what skills and different things we learnt over the process of making our media product (opening sequence). For example some of the things that we would be discussing in our evaluation is, what we learnt from filming our preliminary task to the final full product at the end.

Wednesday, 14 March 2012

Sunday, 11 March 2012

Media Production Filming Short term plans- For Final Draft

Media Studies Short Term Media Plans

DATE
&
TIME
LOCATION
RISK ASSESSMENT
(Health & Safety)

Costume/Props
Needed
EQUIPMENT
Needed
Tuesday 13th March 2012
3:30pm  as it starts to get dark around 5-5:15pm



-Wormwood scrubs (next to Linford Christie Stadium)
-by the 220 bus from Harlesden (park Parade bus stop) and the same bus back
-public place open 24/7
-We are able to film without permission as it is an open and public space
Actors: we have permission to film the actor.  
Health: yes both actors are fit and healthy to film on this day
If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc.
Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road
Safety: we have to be safe with the tripod and the camera as the ground is not all on one level
Costume 1st actor: black trousers, black bin bag, black shoes, red and black coat  
1 Video camcorder  (Sony)
1 Tripod
1 camera charger              




DATE & TIME  
LOCATION
RISK ASSESSMENT
(HEALTH & SAFETY)
Costume/ Props Needed
EQUIPMENT Needed
Wednesday 14th March 2012
Wormwood scrubs (next to Linford Christie Stadium)
-by the 220 bus from Harlesden (park Parade bus stop) and the same bus back
-public place open 24/7
-We are able to film without permission as it is an open and public space
Actors: we have permission to film the actor. 
Health: yes both actors are fit and healthy to film on this day
If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc.
Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road
Safety: we have to be safe with the tripod and the camera as the ground is not all on one level
Costume 1st actor: black trousers, black bin bag, black shoes, red and black coat  
1 Video camcorder  (Sony)
1 Tripod
1 camera charger             


Sunday, 12 February 2012

Media Production Filming Short term plans- For Draft 3

Media Studies Short Term Media Plans

DATE
&
TIME
LOCATION
RISK ASSESSMENT
(Health & Safety)

Costume/Props
Needed
EQUIPMENT
Needed
Wednesday 15th February 2012
3:30pm  as it starts to get dark around 4:20-4:30


-Wormwood scrubs Park (next to Linford Christie Stadium)
-by the 220 bus from Harlesden (park Parade bus stop) and the same bus back
-public place open 24/7
-We are able to film without permission as it is an open and public space
Actors: we have permission to film the actor.  
Health: yes both actors are fit and healthy to film on this day
If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc.
Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road
Safety: we have to be safe with the tripod and the camera as the ground is not all on one level
Costume 1st actor: black leggings, Green jacket, earnings, pink trainers.
Costume/ props 2nd actor: black bin bag, red and black shoes, white cut up with blood on shirt, navy blue top on underneath, black trousers 
 
1 Video camcorder  (Sony)
1 Tripod
1 camera charger              

Friday, 10 February 2012

2nd Draft Opening Sequence Video

Assessment of Assignment Draft 2


ASSESSMENT OF ASSIGNMENT ___: Opening Sequence Draft 2
Self Assessment:        
In this assignment, I think WWW was….
- The filming that we done
- The music that we chose to use for our opening sequence
- The whole idea of the opening sequence as it creates enigma
In this assignment, it would have been EBI I….
- used our light sources correctly as parts of the film were dark
- again re-think our mise-en-scene as it did not go with the clip 

Record of Grade:        
In this assignment I would have graded myself with a grade ___ because…. I received a grade ___.
Targets to improve:    
To improve on this assignment I need to….

Teacher Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Peer Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Any additional drafts: 
If you did another draft, make sure you post it above the draft 2

Monday, 6 February 2012

Media Production Filming Short term plans- For Draft 2

Media Studies Short Term Media Plans
this is a table to show our plans for our next session of filming, it includes things like health and safety, costume and props needed etc.

DATE
&
TIME
LOCATION
RISK ASSESSMENT
(Health & Safety)

Costume/Props
Needed
EQUIPMENT
Needed
Wednesday 8th February 2012
3:30pm  as it starts to get dark around 4:20-4:30


-Wormwood scrubs (next to Linford Christie Stadium)
-by the 220 bus from Harlesden (park Parade bus stop) and the same bus back
-public place open 24/7
-We are able to film without permission as it is an open and public space
Actors: we have permission to film the actor.  
Health: yes both actors are fit and healthy to film on this day
If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc.
Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road
Safety: we have to be safe with the tripod and the camera as the ground is not all on one level
Costume 1st actor: black trousers, black bin bag, black shoes,
 
1 Video camcorder  (Sony)
1 Tripod
1 camera charger              

Sunday, 29 January 2012

Exam Lessons

In class we have learnt about the exam process for section A which had all of the terminology and key words in it and we are now currently onto studying for section B. I am really enjoying studying and analysing things about the exam as I feel that it would really help me when it comes down to doing the actual exam.  Although section B is harder to learn than section A I feel that I am trying my best and that if I do everything that my teacher says properly that I will pass the exam with flying colours. As I continue learning I plan to take a lot more in which will not only help me for exam purposes but also would help me for later life as the world is depending more and more on media each day.  

1st Draft Opening Sequence video

Friday, 27 January 2012

Assessment of Assignment


ASSESSMENT OF ASSIGNMENT ___: Opening Sequence Draft 1
Self Assessment:        
In this assignment, I think WWW was….
- The filming that we done
- The music that we chose to use for our opening sequence
- The whole idea of the opening sequence as it creates enigma
In this assignment, it would have been EBI I….
- We had done our mise-en-scene correctly
- Used the tripod more for better and steadier shots 

Record of Grade:        
In this assignment I would have graded myself with a grade ___ because…. I received a grade ___.
Targets to improve:    
To improve on this assignment I need to….

Teacher Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Peer Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Any additional drafts: 
If you did another draft, make sure you post it above the draft 1