Sunday, 12 February 2012

Media Production Filming Short term plans- For Draft 3

Media Studies Short Term Media Plans

DATE
&
TIME
LOCATION
RISK ASSESSMENT
(Health & Safety)

Costume/Props
Needed
EQUIPMENT
Needed
Wednesday 15th February 2012
3:30pm  as it starts to get dark around 4:20-4:30


-Wormwood scrubs Park (next to Linford Christie Stadium)
-by the 220 bus from Harlesden (park Parade bus stop) and the same bus back
-public place open 24/7
-We are able to film without permission as it is an open and public space
Actors: we have permission to film the actor.  
Health: yes both actors are fit and healthy to film on this day
If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc.
Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road
Safety: we have to be safe with the tripod and the camera as the ground is not all on one level
Costume 1st actor: black leggings, Green jacket, earnings, pink trainers.
Costume/ props 2nd actor: black bin bag, red and black shoes, white cut up with blood on shirt, navy blue top on underneath, black trousers 
 
1 Video camcorder  (Sony)
1 Tripod
1 camera charger              

Friday, 10 February 2012

2nd Draft Opening Sequence Video

Assessment of Assignment Draft 2


ASSESSMENT OF ASSIGNMENT ___: Opening Sequence Draft 2
Self Assessment:        
In this assignment, I think WWW was….
- The filming that we done
- The music that we chose to use for our opening sequence
- The whole idea of the opening sequence as it creates enigma
In this assignment, it would have been EBI I….
- used our light sources correctly as parts of the film were dark
- again re-think our mise-en-scene as it did not go with the clip 

Record of Grade:        
In this assignment I would have graded myself with a grade ___ because…. I received a grade ___.
Targets to improve:    
To improve on this assignment I need to….

Teacher Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Peer Assessment: 
If applicable then this is to include a copy of the teacher assessment (JPEG image) as a post.
If not, write N/A.
Any additional drafts: 
If you did another draft, make sure you post it above the draft 2

Monday, 6 February 2012

Media Production Filming Short term plans- For Draft 2

Media Studies Short Term Media Plans
this is a table to show our plans for our next session of filming, it includes things like health and safety, costume and props needed etc.

DATE
&
TIME
LOCATION
RISK ASSESSMENT
(Health & Safety)

Costume/Props
Needed
EQUIPMENT
Needed
Wednesday 8th February 2012
3:30pm  as it starts to get dark around 4:20-4:30


-Wormwood scrubs (next to Linford Christie Stadium)
-by the 220 bus from Harlesden (park Parade bus stop) and the same bus back
-public place open 24/7
-We are able to film without permission as it is an open and public space
Actors: we have permission to film the actor.  
Health: yes both actors are fit and healthy to film on this day
If there is a break needed the Westfield London shopping centre is down the road for the toilet or café etc.
Safety: the location is safe and it is an open space, however when we come off the bus we would have to cross one road
Safety: we have to be safe with the tripod and the camera as the ground is not all on one level
Costume 1st actor: black trousers, black bin bag, black shoes,
 
1 Video camcorder  (Sony)
1 Tripod
1 camera charger